Power and cooling for AI data centres
Complete turnkey solutions or selected parts of the data centre, from energy infrastructure and storage to power supply, redundancy and backup.

AI Data Centers
Data centres where power and cooling decide the economics
Within data centres we deliver complete turnkey solutions or selected parts of the data centre, depending on what the customer needs.
That can be anything from energy infrastructure and storage to power supply, redundancy, backup solutions and integration between the data centre and the energy system.

Flexible AIDC
Built for demanding AI loads
The solutions connect computing power and energy, so the data centre gets stable power, green supply and lower total cost.
Contact usPower for critical operation
High, stable power quality for demanding AI computation.
Green integration
Seamless operation with a high share of renewable energy.
Lower TCO
Maximum energy efficiency and lower operating costs.
Energy independence
Robust security of supply and local independence from the grid.
ESG and CO₂
Faster CO₂ reduction that meets strict sustainability targets.
Critical redundancy
Uninterrupted backup power for the core infrastructure.
SGHS Powered by Kortrong AIDC in numbers
- PUE, against 1.4-1.5 in a traditional server room
- 1.05-1.10
- energy saved on cooling and operation
- 30 %+
- build time, against 10-15 months
- 1-3 months
Read on
Other solutions and technologies
BESS and AIDC belong together, and the cooling technology decides safety, lifetime and economy alike.
Are you planning a data centre?
We take part both as main supplier and as technical partner on selected parts of the project.